Shanghai Industrial Boiler Co., Ltd./Shanghai industrial boiler (Wuxi) Co., Ltd.
Solution·Application area
Glass industry
The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
    

 

    
Glass kiln waste heat power generation process flow chart

The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.

2018/08/16 14:44:43

16525

Prev Next
×
主站蜘蛛池模板: 美女扒开尿道让男人捅 | 亚洲精品无码国产 | 精品偷拍在线一区二区 | 午夜少妇男人h黑人亚洲加勒比无码一区二区 | 久久精品农村毛片 | 亚洲天堂网在线观看视频 | 国产日韩aⅴ无码一区二区三区 | 中文字幕一区二区三区有限公司 | 毛片久久| 星空麻豆大 | 免费观看国产一区二区三区 | 无码成人亚洲AV片 | 久久久亚洲精品国产 | 2024毛片| 伊人久久精品久久亚洲一区 | 日韩欧美亚洲免费在线 | 精品国产乱码久久久久久蜜桃一 | 亚洲av永久青草无码精品 | 色偷偷人人澡人人爽人人模 | 天天草天天流 | 国产成人亚洲影院在线观看 | 人与动动物a级毛片中文 | 久久99国产精品久久99小说 | 精品日日夜夜亚洲国产永久 | 中文字幕日韩欧美一区二区三区 | 91在线视频免费观看 | 国产精品JIZZ在线观看A片 | 国产精品无码永久免费视频 | 国产精品亚洲中文av在线 | 亚洲综合色噜噜狠狠网站超清 | 性欧美在线视频a片俄 | 亚洲伊人成综合网色777 | 91精品国产91久久综合 | 九九精品久久久久久久久 | 久久久久夜夜夜精品国产小说 | 国产精品久久人妻拍拍水牛影视 | 美妇乱人伦交换小说/大乳欲妇三级一区二区三区/天天操 | 久久精品国产一区二区三 | 日韩色情图片小说AV一区 | 国产色婷婷一区二区三区 | 国产无人区卡一卡二卡乱码 |